SITE INSTRUCTION SHEET
CONTRACT NAME: Routine Maintenance of .. Road (6.4km), Routine (20.16km) and Periodic Maintenance (5.0 km) and Construction of Culverts and Side Drains of Urban Roads
CONTRACT NO: TRR/2020/2021/..
CONSULTANT: District Engineer
(Works) –
CONTRACTOR: M/S ..... Co.Ltd P. O. Box ......, .
SITE INSTRUCTION NO:
01 DATE: 2nd May, 2017 INSTRUCTION DETAILS The client has decided to add more
works to this contract Therefore you are hereby instructed to carry out
immediately the following additional works; CONSTRUCTION OF CULVERTS AND SIDE DRAINS ALONG URBAN
ROAD 1. Reinforced concrete class 20
(1:2:4) access slab ( 22 nos ). |
|
SIGNED:…………………………….
District
Works Engineer DATE:…………………………… |
SIGNED:…………………………… Contractor DATE:……………………………. |